Current Projects

Project/ Location Lincoln Eastern Bypass
Date: March 2018 - Present
Description: Construction 1 permanent rail bridge crossing the river.
Construction 3 temporary bridges.
Customer: Galliford Try (March 2018 - Present)
Project/ Location Ely Southern Bypass
Date: June 2017- Present
Description: Construction of new road and new rail bridge.
Customer: VolkerFitzpatrick
See the case study

Recent Projects

Project/ Location Lincoln Eastern Bypass
Date: October 2017 – January 2018
Description: Construction 4 permanent bridges including rail and river crossing.
Construction 3 temporary bridges.
Customer: Carillion
Project/ Location Ipswich Tidal Barrier
Date: January 2017 – November 2017
Description: Construction of reinforced concrete tidal barrier structure.
Customer: VolkerStevin
Boskalis Atkins
Joint Venture
See the case study
Project/ Location Cramlington Biomass CHP Plant
Date: March 2016 – November 2017
Description: Renewable Energy Plant
FRC, Pile cropping, Excavation, Drainage, Earthing
Customer: BWSC – Burmeister Wain Scandanavian Contractor
See the case study
Project/ Location Kent Biomass CHP Plant
Date: October 2016 – October 2017
Description: Renewable Energy Plant
FRC, Pile cropping, Excavation, Drainage, Earthing
Customer: BWSC – Burmeister Wain Scandanavian Contractor
See the case study
Project/ Location Mersey Gateway – Bridge RFC Works
Date: May 2015 – October 2017
Description: Six lane cable bridge over the river Mersey. FRC works for approach viaducts including piers, diaphragm beams and casting main deck area.
Customer: MCCJV – Kier
FCC Samsung
Joint Venture
See the case study
Project/ Location A1L2B – A1 Widening – Leeming Bar to Barton
Date: August 2014 – September 2017
Description: Highways project A1 upgrade. 7 over bridges including over live highways and water.
Customer: Carillion Morgan Sindall Joint Venture
See the case study
Project/ Location Tilbury Biomass CHP Plant
Date: October 2015 – April 2017
Description: Renewable Energy Plant
FRC, Pile cropping, Excavation, Drainage, Earthing
Customer: BWSC – Burmeister Wain Scandanavian Contractor
See the case study
Project/ Location Crossrail – C644 Traction Power
Date: January 2016 – March 2017
Description: Crossrail – Traction power substation construction. Site clearance, piling, drainage, reinforced concrete foundations. Road works
Customer: Alstom Costain Joint Venture
See the case study
Project/ Location Snetterton Recycled Energy Power
Date: May 2015 - April 2016
Description: Renewable Energy Plant
FRC, Pile cropping, Excavation, Drainage, Earthing
Customer: BWSC – Burmeister Wain Scandanavian Contractor
See the case study
Project/ Location Finningley And Rossington Regeneration Route Scheme (Farrrs)
Date: December 2013- February 2016
Description: Highways project 2 bridges over rail lines, 4 bridges over water courses, 2 pedestrian subways and 8 No. culverts
Customer: Carillion
See the case study
Project/ Location Crossrail C610 – Systemwide Enabling Works
Date: September 2014 -December 2015
Description: Temporary rail head. Trench excavation, pipe laying and chamber installation. Pavement and track pit construction.
Customer: Alstom TSO Costain Joint Venture
See the case study
Project/ Location Thameslink programme – Cricklewood, Peterborough & Horsham
Date: May 2014 – October 2015
Description: Construction of new railway sidings.
Customer: Carillion Plc
Project/ Location Albert Docks, Hull Flood Relief management Scheme
Date: February 2015 – August 2015
Description: Flood Defence Wall Construction
Customer: VolkerStevin Boskalis Atkins Joint Venture
Project/ Location New Cross Gate depot Extension
Date: January 2014- January 2015
Description: London Overground Capacity Improvement Project extension to maintenance depot and wheel lathe building.
Customer: C Spencer Ltd

Historical Projects

Project/ Location Grimsby Docks – Flood Relief Management Scheme
Date: July 2014 – October 2014
Description: Flood Defence Wall Construction.
Customer: VolkerStevin Boskalis Atkins Joint Venture
Project/ Location Canal Tunnels – London
Date: February 2013- March 2014
Description: Installation of a new track slab linking the East Coast Mainline with St Pancras. Involving pumping approximately 5000m3 concrete and installing new walkways and exits to the two new tunnels.
Customer: Carillion
See the case study
Project/ Location Putney Rail Station Refurbishment
Date: July 2013 – February 2014
Description: Construction of a new concourse and ticket office while the existing station and rail remained live.
Customer: C Spencer Ltd
Project/ Location Ipswich Chord – Suffolk
Date: May 2013- February 2014
Description: Network Rail project- increasing the capacity of 2 No. existing rail bridges 1 No. new build rail bridge, a pedestrian subway and 420m of retaining wall adjacent to the live rail line.
Customer: C Spencer Ltd
Project/ Location Paddington Station – London
Date: June 2010 – June 2013
Description: New pile-caps to existing platform for a new canopy support. Pre-cast beam encasement including refurbishment of the Network rail platforms, London underground new station new taxi ramp above Paddington station.
Customer: Carillion
Project/ Location North Pilfrey Bridge
Date: April 2012- November 2012
Description: Reinforced concrete works on construction of abutments and bridge deck for Keadby Bridge, Keadby.
Customer: Balfour Beatty
Project/ Location White Rose Way Phase 1
Date: October 2011- May 2012
Description: Highways project for the Doncaster Metropolitan Borough Council consisting of an overbridge for the East Coast Main Line with 2 intermediate piers approx. 8m in height.
Customer: Balfour Beatty
Project/ Location Staythorpe ‘C’ Power Station – Newark
Date: March 2008 - November 2011
Description: Construction of a new 1700MWe gas-fired power station.
Initial site establishment (Kier Construction); construction of the four power islands and associated works (Laing O'Rourke); balance of plant and infrastructure (Alstom).
Customer: Kier (March 2008 - June 2008)
Laing O’Rourke (June 2008 - September 2009)
Alstom (September 2009 - November 2010)
Alstom (November 2010 - November 2011)
See the case study