Project/ Location
Lincoln Eastern Bypass
Date:
March 2018 - Present
Description:
Construction 1 permanent rail bridge crossing the river.
Construction 3 temporary bridges.
Customer:
Galliford Try (March 2018 - Present)
Project/ Location
Ely Southern Bypass
Date:
June 2017- Present
Description:
Construction of new road and new rail bridge.
Customer:
VolkerFitzpatrick
See the case study
Project/ Location
Lincoln Eastern Bypass
Date:
October 2017 – January 2018
Description:
Construction 4 permanent bridges including rail and river crossing.
Construction 3 temporary bridges.
Customer:
Carillion
Project/ Location
Ipswich Tidal Barrier
Date:
January 2017 – November 2017
Description:
Construction of reinforced concrete tidal barrier structure.
Customer:
VolkerStevin
Boskalis Atkins
Joint Venture
See the case study
Project/ Location
Cramlington Biomass CHP Plant
Date:
March 2016 – November 2017
Description:
Renewable Energy Plant
FRC, Pile cropping, Excavation, Drainage, Earthing
Customer:
BWSC – Burmeister Wain Scandanavian Contractor
See the case study
Project/ Location
Kent Biomass CHP Plant
Date:
October 2016 – October 2017
Description:
Renewable Energy Plant
FRC, Pile cropping, Excavation, Drainage, Earthing
Customer:
BWSC – Burmeister Wain Scandanavian Contractor
See the case study
Project/ Location
Mersey Gateway – Bridge RFC Works
Date:
May 2015 – October 2017
Description:
Six lane cable bridge over the river Mersey. FRC works for approach viaducts including piers, diaphragm beams and casting main deck area.
Customer:
MCCJV – Kier
FCC Samsung
Joint Venture
See the case study
Project/ Location
A1L2B – A1 Widening – Leeming Bar to Barton
Date:
August 2014 – September 2017
Description:
Highways project A1 upgrade. 7 over bridges including over live highways and water.
Customer:
Carillion Morgan Sindall Joint Venture
See the case study
Project/ Location
Tilbury Biomass CHP Plant
Date:
October 2015 – April 2017
Description:
Renewable Energy Plant
FRC, Pile cropping, Excavation, Drainage, Earthing
Customer:
BWSC – Burmeister Wain Scandanavian Contractor
See the case study
Project/ Location
Crossrail – C644 Traction Power
Date:
January 2016 – March 2017
Description:
Crossrail – Traction power substation construction. Site clearance, piling, drainage, reinforced concrete foundations. Road works
Customer:
Alstom Costain Joint Venture
See the case study
Project/ Location
Snetterton Recycled Energy Power
Date:
May 2015 - April 2016
Description:
Renewable Energy Plant
FRC, Pile cropping, Excavation, Drainage, Earthing
Customer:
BWSC – Burmeister Wain Scandanavian Contractor
See the case study
Project/ Location
Finningley And Rossington Regeneration Route Scheme (Farrrs)
Date:
December 2013- February 2016
Description:
Highways project 2 bridges over rail lines, 4 bridges over water courses, 2 pedestrian subways and 8 No. culverts
Customer:
Carillion
See the case study
Project/ Location
Crossrail C610 – Systemwide Enabling Works
Date:
September 2014 -December 2015
Description:
Temporary rail head. Trench excavation, pipe laying and chamber installation. Pavement and track pit construction.
Customer:
Alstom TSO Costain Joint Venture
See the case study
Project/ Location
Thameslink programme – Cricklewood, Peterborough & Horsham
Date:
May 2014 – October 2015
Description:
Construction of new railway sidings.
Customer:
Carillion Plc
Project/ Location
Albert Docks, Hull Flood Relief management Scheme
Date:
February 2015 – August 2015
Description:
Flood Defence Wall Construction
Customer:
VolkerStevin Boskalis Atkins Joint Venture
Project/ Location
New Cross Gate depot Extension
Date:
January 2014- January 2015
Description:
London Overground Capacity Improvement Project extension to maintenance depot and wheel lathe building.
Customer:
C Spencer Ltd
Project/ Location
Grimsby Docks – Flood Relief Management Scheme
Date:
July 2014 – October 2014
Description:
Flood Defence Wall Construction.
Customer:
VolkerStevin Boskalis Atkins Joint Venture
Project/ Location
Canal Tunnels – London
Date:
February 2013- March 2014
Description:
Installation of a new track slab linking the East Coast Mainline with St Pancras. Involving pumping approximately 5000m3 concrete and installing new walkways and exits to the two new tunnels.
Customer:
Carillion
See the case study
Project/ Location
Putney Rail Station Refurbishment
Date:
July 2013 – February 2014
Description:
Construction of a new concourse and ticket office while the existing station and rail remained live.
Customer:
C Spencer Ltd
Project/ Location
Ipswich Chord – Suffolk
Date:
May 2013- February 2014
Description:
Network Rail project- increasing the capacity of 2 No. existing rail bridges 1 No. new build rail bridge, a pedestrian subway and 420m of retaining wall adjacent to the live rail line.
Customer:
C Spencer Ltd
Project/ Location
Paddington Station – London
Date:
June 2010 – June 2013
Description:
New pile-caps to existing platform for a new canopy support. Pre-cast beam encasement including refurbishment of the Network rail platforms, London underground new station new taxi ramp above Paddington station.
Customer:
Carillion
Project/ Location
North Pilfrey Bridge
Date:
April 2012- November 2012
Description:
Reinforced concrete works on construction of abutments and bridge deck for Keadby Bridge, Keadby.
Customer:
Balfour Beatty
Project/ Location
White Rose Way Phase 1
Date:
October 2011- May 2012
Description:
Highways project for the Doncaster Metropolitan Borough Council consisting of an overbridge for the East Coast Main Line with 2 intermediate piers approx. 8m in height.
Customer:
Balfour Beatty
Project/ Location
Staythorpe ‘C’ Power Station – Newark
Date:
March 2008 - November 2011
Description:
Construction of a new 1700MWe gas-fired power station.
Initial site establishment (Kier Construction); construction of the four power islands and associated works (Laing O'Rourke); balance of plant and infrastructure (Alstom).
Customer:
Kier (March 2008 - June 2008)
Laing O’Rourke (June 2008 - September 2009)
Alstom (September 2009 - November 2010)
Alstom (November 2010 - November 2011)
See the case study